An automatic plastic dip coating line applies a PE layer to metal products (wire racks, frames, hooks…) by dipping them in a fluidised powder bed: parts are heated and dipped into PE powder kept "boiling" by air, so the powder adheres and flows into an even, durable, rust-proof and insulating coating. KIEUAN designs and builds complete lines with automatic PLC control.
KIEUAN designed, fabricated, installed and commissioned an automatic PE powder dip-coating line for Thanglong Metal Wares Joint Stock Company (Công ty CP Kim khí Thăng Long) in Sai Dong, Long Bien, Hanoi. The line coats steel wire racks at a design capacity of 3,500 pieces per shift. Installation was completed on 4 February 2024, and the line was fine-tuned and finalised through June 2024.
| Client | Thanglong Metal Wares Joint Stock Company |
| Location | Sai Dong, Long Bien, Hanoi, Vietnam |
| Product | PE-coated steel wire racks |
| KIEUAN scope | Survey, design, fabrication, installation, commissioning, technology transfer |
| Design capacity | 3,500 pieces per shift |
| Timeline | October 2023 – June 2024 |
Thanglong Metal Wares wanted to automate wire-rack coating within the footprint of an old paint line, reusing part of its equipment. After a site survey in October 2023, KIEUAN proposed:

Line layout: 21 hangers, 66 m conveyor, 31.4 m system length
All mechanical systems, ovens and control panels were built at KIEUAN's own factory in January 2024, then pre-assembled and test-run before leaving the fabrication shop. The equipment was dismantled, shipped and fully installed at Thanglong Metal Wares' factory on 4 February 2024.

Conveyor and ovens pre-assembled at the KIEUAN workshop

2,000-litre fluidised bath and 3-tonne lifting frame

Central PLC + HMI control cabinet

Installed at Thanglong Metal Wares, completed 4 February 2024
From November 2023 to March 2024, KIEUAN dip-tested several powders and heat settings on samples supplied by Thanglong Metal Wares. The process runs: loading → pre-heating → fluidised-bed dipping → post-curing → cooling → unloading. In the test of 9 March 2024, the coating reached 350 – 400 µm thickness and 50 – 60 gloss with an even surface.

Powder fluidising evenly in the dipping bath

Wire racks after PE coating, 350 – 400 µm

Test samples with settings written on the labels
After fine-tuning through June 2024, KIEUAN trained Thanglong Metal Wares' team and transferred the process so they can run the line and produce parts to specification.
KIEUAN CO., LTD.
Our staff will be happy to answer your questions and requests! Talk to us directly or fill in the enquiry form below. We look forward to hearing from you!